Summary

Client Owners Corporation
Value $ 400k
Location Brunswick West, Melbourne

Brunswick West Cladding Replacement Project

MAZ Group delivered this D&C project to provide a cladding redesign for the removal of non-compliant aluminium composite panels from the external facade to be replaced with 3mm solid aluminium panels.

Working with multiple stakeholders, through comprehensive site investigations, detailed designs and documentation, the delivery of works included the identification and removal of all existing non-compliant cladding, temporary services diversions and rectification of existing defects which were  identified during demolition phase and included areas of non-compliant glazing and box-gutter installation and non-compliant balcony hob works.

Our Challenges

With the project being carried out on a residential street with ongoing foot and vehicle traffic, the team needed to maintain a safe working environment and complete works in a timely manner to avoid disrupting local residents as well as the owners and tenants living within the apartment complex.

The works undertaken were to meet Cladding Safety Victoria’s requirements.

Our Solutions

MAZ Group worked closely with the representative of the Owners Corporation to ensure all works were up to standard.

Our Key Outcomes

Works were executed within the program timeframe with minimal disruption to the owners and tenants of the apartment complex and existing defects were rectified to the satisfaction of the Owners Corporation representatives.